Many cathodic protection (CP) skids, SCADA huts and telemetry sites still run on lead-acid batteries. They work, but they wear out fast in the heat, they don't like sitting part-charged through winter, and they give little warning before they fail.
This guide is for the people who own and design those sites. It answers the questions we hear most often about moving to lithium: is it safe, will it cope with the heat, what happens when something fails, and what changes on the skid. Every figure comes from the LiFe² 5120S datasheet and manuals unless it says otherwise.
For installation, wiring and settings, use the LiFe² 5120S Installation and Operation Manual, the PCE Integration Guide and the System Sizing Guide, at aerl.com.au.
| Concern | Short answer |
|---|---|
| Is lithium safe? | The LiFe² uses lithium iron phosphate (LFP), one of the most heat-stable lithium chemistries. Every module has its own battery management system (BMS) and its own 125 A breaker. The cells are tested to UL 9540A and IEC 62619. |
| Will it cope with the heat? | It has no fans to fail. It keeps its full rates to a battery temperature of 45 °C and keeps working, at lower rates, to 55 °C. Its cycle-life data at 45 °C shows about 4500 cycles to 70% capacity. A cool enclosure still gives the longest life. |
| What if a module fails? | The modules are in parallel, not in series. A faulty module disconnects itself and the rest keep supplying the site. Fit one or two more modules than you need and you have N + 1 or N + 2. |
| What if the comms fail? | Run the battery Managed, talking to the chargers over CAN bus. With CoolMax SRX chargers and supported inverters, if the link is lost it falls back to Self-Managed operation automatically and keeps supplying the site. |
| Can it replace our lead-acid? | Yes. It is a 48 V-class battery (51.2 V nominal) and works with CoolMax SRX charge controllers. |
| Can our SCADA see it? | Yes. A Nexus Gateway collects the battery and SRX data on site and serves it over Modbus TCP, with no internet connection needed. |
| What maintenance does it need? | No watering, no equalising, no fans or filters. Check the site, the connections and the breakers on your normal visits. |
| Lead-acid (typical) | LiFe² 5120S | |
|---|---|---|
| Usable energy | About 50% of nameplate, for a long life | 80% of nameplate by default (up to 100% allowed) |
| Life in the heat | Rated at 20–25 °C. Roughly halves for every 8–10 °C hotter | About 4500 cycles to 70% at 45 °C |
| Left part-charged | Sulphates and loses capacity | No harm. Needs a regular full charge (every 14–30 days) to keep its state of charge (SOC) reading accurate |
| Weight per usable kWh | About 50–60 kg | About 11 kg (44 kg per module, at 80% depth of discharge) |
| How it's built | One series string of 2 V cells | Parallel modules, each with its own BMS and breaker |
| One bad cell | Can take the whole string down | Takes one module out. The rest keep running |
| Gassing | Vents hydrogen when overcharged | Sealed. No gassing in normal use |
| What you can see | Bank voltage | State of charge, health, cell voltages and temperatures, and alarms, on your SCADA |
| Maintenance | Watering (flooded), equalising, cell checks | None on the battery itself |
Lead-acid figures are typical values for stationary lead-acid batteries, not a specific product. Check your own battery's datasheet.
A CP skid runs a small, steady load around the clock. The battery charges by day and supplies the site by night, every day, often in a hot steel enclosure far from anyone who can check it. That is hard on lead-acid: heat shortens its life, and a run of cloudy winter days leaves it part-charged, which sulphates the plates. The bank fades quietly until the CP output drops out.
Heat costs the LiFe² far less life, sitting part-charged doesn't harm it, and it reports its state, so you can see a problem before the CP output drops.
There are several lithium chemistries. The LiFe² uses lithium iron phosphate (LFP, LiFePO4). LFP cells are much harder to drive into thermal runaway than the nickel-based cells (NMC) used in many cars and home batteries, because their cathode does not release oxygen the same way when overheated. LFP contains no cobalt.
| Level | Standards |
|---|---|
| Cell | UL 1973, UL 9540A, IEC 62619:2022, UN 38.3 |
| Battery module | IEC 62619:2022, IEC 62040-1, UN 38.3, CE |
UL 9540A is the test method for thermal runaway fire propagation; the LiFe² cells are tested at cell level. IEC 62619 sets the safety requirements for industrial lithium batteries. UN 38.3 covers transport.
Each LiFe² module protects itself. Its Battery Management System (BMS) watches every cell and acts on:
The BMS also balances the cells actively, so no cell drifts high or low over the years.
| Item | Value per module |
|---|---|
| Short-circuit current | 2000 A |
| Arc flash incident energy (at 45 cm) | 0.341 cal/cm² |
| Arc flash boundary | About 24 cm |
| Item | Value per module |
|---|---|
| Integrated breaker | 2-pole, 125 A, 80 V DC |
| Weight | 44 kg |
These values are for one module. In a bank, the fault current adds up: 2000 A for each module in parallel. Rate the DC isolation for the whole bank, and assess the arc-flash hazard at the bank busbar and DC isolator, not at one module.
Install to AS/NZS 5139 and AS/NZS 3000. AS/NZS 5139 needs 2-pole DC isolation (MCCBs) between the battery and the charger or DC bus. The LiFe² cabinets have no DC breaker of their own, so fit it outside the cabinet.
A failing LFP battery can still release smoke and flammable gases. If a battery enclosure is smoking or venting, keep clear and call 000. Fight a battery fire only with a full-face breathing apparatus (SCBA) and full protective gear, using a dry chemical extinguisher. See the LiFe² 5120S Safety Data Sheet.
The LiFe² has no hazardous-area (Ex) certification. Install it outside any classified zone, as you would other non-Ex electrical equipment on the skid.
A 48 V lead-acid bank is 24 cells in series. Every cell carries the full current, and one weak or open cell can take the whole bank down.
A LiFe² bank is built the other way. Each module is a complete 48 V-class battery, with its own cells, BMS and breaker. The modules are connected in parallel (series connection is not permitted), up to 64 of them. If one module trips or fails, the others keep supplying the site at the same voltage. You lose that module's share of the capacity, not the site.
Because each module stands alone, redundancy is just a matter of fitting more modules than the site needs:
On a normal day the spare modules share the load, so every module works a little less hard. On a bad day the site keeps its full autonomy with a module out.
N + X covers a fault in one module. It doesn't cover a problem that hits every module at once, such as an overheated enclosure or a bank run flat. Design the enclosure and the charging for those (chapters 04 and 05).
| Step | Working |
|---|---|
| Load | A CP unit drawing 8 A at 51.2 V: 410 W, or 9.8 kWh a day |
| Autonomy | 3 days without sun: 29.5 kWh |
| Usable energy per module | 4.096 kWh (Managed, 80% depth of discharge) |
| N | 29.5 ÷ 4.096 = 7.2, rounded up to 8 modules |
| Installed | 10 modules in a LiFe²-CAB10-OUTD (51.2 kWh, IP55) |
| Result | N + 2. With two modules out, a new bank still has its full 3 days |
Capacity fades with age, to 70% at end of life. To keep the full margin for the life of the bank, size N on 70% of the usable energy. Your own numbers will differ. The LiFe² 5120S System Sizing Guide sets out the full method, including charge current and cabinet limits.
Run the LiFe² in Managed mode. The master battery talks to the chargers over CAN bus: it sends its state of charge, its charge and discharge limits as the temperature changes, and its alarms. The chargers work within those limits.
If the comms link is lost (a damaged cable, a failed connector, a charger swapped out), the LiFe² falls back to Self-Managed operation by itself. Each module's BMS keeps protecting its own cells, the chargers carry on with the LiFe² settings programmed into them, and the site keeps running. When the link is restored, the battery returns to Managed mode automatically. No one has to visit site to reset it.
That gives two independent layers: the chargers follow the battery's limits while the link is up, and each module protects itself whether the link is up or not.
At commissioning, program every charger with the LiFe² Self-Managed settings (no more than 56 V, no more than 70 A per module across all chargers, and no more than the cabinet's busbar rating) as its fallback. Fallback applies with supported chargers and inverters. Some inverters stop, or can be set to stop, when they lose the battery's data (a Victron system, for example): check this at commissioning.
If the master module itself fails or is removed, the other modules switch to Self-Managed and run independently, without interrupting supply. Bank data stops reaching the chargers and the Nexus Gateway until the master is replaced.
| Battery temperature | Charge | Discharge |
|---|---|---|
| 20–45 °C | Up to 1C (100 A per module) | Up to 1C (100 A per module) |
| 45–50 °C | Up to 0.5C (50 A per module) | Up to 0.8C (80 A per module) |
| 50–55 °C | Up to 0.2C (20 A per module) | Up to 0.6C (60 A per module) |
| 56 °C | BMS cuts off | BMS cuts off |
These are battery (cell) temperatures, not air temperatures, from the LiFe² Installation and Operation Manual, chapter 12. Below 20 °C the rates also fall (Cold Sites, below).
In Managed mode the battery sends these limits to the chargers as its temperature changes. In Self-Managed operation the chargers don't know them, and the BMS can only disconnect a module that goes past them. So set the fallback charge current for the hottest battery temperature you expect: no more than 20 A per module if the battery can reach 50 °C.
A CP load is small. In the worked example (chapter 03), the CP unit draws 8 A from a ten-module bank: under 1 A per module, or less than 0.01C. Even at 50–55 °C each module may discharge at 60 A. On the charge side, ten modules accept 200 A at 0.2C. For comparison, one CoolMax SRX 600/70-48 delivers up to 70 A.
| Battery temperature | Cycles to 70% capacity (80% depth of discharge) | Years at one cycle a day |
|---|---|---|
| 25 °C | About 7000 | About 19 |
| 35 °C | About 5500 | About 15 |
| 45 °C | About 4500 | About 12 |
These are laboratory cycle-life figures, from the LiFe² Installation and Operation Manual, chapter 11. A shallower daily cycle gives more cycles. Batteries also age with time, faster when hot, so a cool, shaded enclosure still adds life. The warranty is up to 10 years (chapter 07). Lead-acid in the same 45 °C enclosure would typically last a small fraction of its rated life.
The LiFe² is cooled by natural convection. There are no fans, filters or air-conditioners to fail, block with dust or service. On a remote skid that matters: a failed fan on an actively cooled battery is a site visit.
Passive cooling works when the enclosure lets the heat out. In the field that means:
The LiFe² is suited to hot sites as long as it stays within its ratings: the battery temperature limits above, and no sustained ambient temperature above 55 °C or below −20 °C (the warranty limits). The cooler it runs, the longer it lasts.
| Mode | Charge | Discharge |
|---|---|---|
| Managed | −10 to 55 °C | −20 to 55 °C |
| Self-Managed | 0 to 55 °C | −5 to 55 °C |
Managed operation gives the widest range: the battery charges down to −10 °C (at no more than 0.1C below 0 °C). Self-Managed operation stops charging at 0 °C. On a frosty site, also fit an AERL Battery Sense and turn on the SRX's low-temperature charge cutoff (off by default), so the battery is still protected if it falls back to Self-Managed. Fitting a Battery Sense also turns on the SRX's temperature compensation (50 mV/°C by default): set it to 0 mV/°C for the LiFe².
| Item | What to do |
|---|---|
| Comms | Connect the master battery's COMM port to the chargers' CAN bus (shielded Cat 5, no longer than 5 m), with the Nexus Gateway on the same bus. Check with AERL that the chargers' firmware is current. |
| Charge settings | Program every charger with the LiFe² fallback settings: no more than 56 V, and no more than 70 A per module across all chargers, and no more than the cabinet's busbar rating. On a hot site, less (chapter 04). Set the SRX charge profile in AERL Link. |
| Equalisation | Turn it off. Equalisation is for flooded lead-acid only and damages lithium. |
| Temperature compensation | Not needed for the LiFe². Set it to 0 mV/°C. |
| Depth of discharge | Design for 80% (down to 20% SOC). On a DC-only skid, nothing stops the load at 20% SOC unless the load has its own low-voltage disconnect: otherwise the bank runs down to the BMS cut-off. Size the autonomy so it doesn't get there. |
| Full charge | Make sure the battery reaches 100% at least every 30 days (every 14 days if it is running Self-Managed), so its SOC reading stays accurate. Size the solar array for the winter solstice. |
| DC isolation | Fit 2-pole DC breakers (MCCBs) between the battery and the DC bus, rated for 2000 A short-circuit current per module. |
| Earthing | Earth each module, and the cabinet with a PE cable of at least 25 mm². |
| Enclosure | Use an AERL outdoor cabinet (IP55) or an existing enclosure with the clearances and ventilation in chapter 04. |
A lead-acid bank run flat is usually ruined. A LiFe² module protects itself: its BMS shuts it down before the cells are damaged.
Recovery is automatic: when the solar returns, the bank powers up and starts charging again, with no site visit. Only an extreme discharge trips a module breaker, which then needs resetting on site.
Two things to plan for:
With lead-acid, you find out a bank has failed when the CP output drops. A LiFe² bank tells you how it is doing, down to the cell.
Over its CAN comms, the LiFe² reports:
An AERL Nexus Gateway sits on the skid's CAN bus and collects the data from the LiFe² bank and the CoolMax SRX charge controllers together. It serves the data on the site network over Modbus TCP (port 502), so your SCADA or RTU polls one device for the battery and the chargers.
The Nexus runs entirely locally. It needs no internet connection, no cloud account and no outbound traffic, which suits sites on a closed operational network. The Modbus TCP interface is read-only: it can't change a setting on the battery or the chargers. A Nexus that never connects to AERL Cloud doesn't update itself: ask AERL how to keep its firmware current.
If you also want AERL Cloud dashboards and alerts, the same Nexus can send data to AERL Cloud over Ethernet, Wi-Fi or 4G (Nexus 4G). That's optional: the Modbus TCP interface works the same either way.
The register map is in the Nexus Modbus TCP Protocol, at aerl.com.au.
| Product | Warranty |
|---|---|
| LiFe² 5120S module | 5 years, or 10 years if registered within 60 days of installation. Warranted to keep 70% state of health, up to 15.36 MWh energy throughput, on a once-daily cycle |
| LiFe² cabinets | 2 years |
Register at aerl.com.au/warranty-registration. A module connected to AERL Cloud within 60 days is registered automatically; a site that runs offline must be registered by hand. Full terms are in the LiFe² Warranty Statement, at aerl.com.au.
Return LiFe² modules to AERL at the end of their life. Modules that can be refurbished are tested and passed on for charitable, community or educational use. The rest are recycled.
Bring these to AERL and we can size the bank and the enclosure with you:
AERL designs, supplies and supports power conversion, lithium storage, monitoring and cathodic protection equipment for oil and gas, mining and telecommunications sites across Australia.
AERL Pty Ltd · 1/75 Bluestone Circuit, Seventeen Mile Rocks QLD 4073 · 1800 950 865 · [email protected] · aerl.com.au
| Revision | Date | Change |
|---|---|---|
| 1.0.0 | 11 / 2026 | First issue. |
Australian Energy Research Laboratories
1/75 Bluestone Circuit
Seventeen Mile Rocks QLD 4073
Australia