Integration guide · REV 003
LiFe² 5120S PCE Integration Guide
Charge and discharge parameters for integrating the AERL LiFe² 5120S battery with Power Conversion Equipment (PCEs): recommended minimum battery modules and self-managed settings for Victron Energy, Selectronic SP PRO, Solis, SMA Sunny Island, Deye and Noark inverters.
Foreword
This document focuses solely on the parameters for charging and discharging the battery. All other configurations and system settings are the responsibility of the integrator to manage and implement.
Before beginning programming, the integrator must thoroughly understand the associated Power Conversion Equipment (PCE). AERL strongly recommends that the integrator participate in the manufacturer's training or integration course, if available, to achieve optimal proficiency.
The LiFe² 5120S can operate in either Managed (Comms) or Self-Managed (No Comms) mode. This guide includes instructions for configuring the system and details the minimum battery requirements for connecting to specific inverter brands. Please review this guide carefully before proceeding with configuration.
Installers and integrators must consistently perform detailed and precise system designs to ensure optimal performance and reliability. AERL is not responsible for designs that result in underperformance or failure to meet expected standards.
Settings may be updated without prior notice as part of our continuous improvement process. The settings provided are accurate as of their release or publication date.
Minimum battery modules are recommended to ensure that the batteries can fully support the performance of the connected PCE. In Managed communication mode, the PCE will operate within the battery's performance limits, ensuring system stability. In Self-Managed mode, adhering to the recommended minimum battery capacity is crucial to maintain battery performance within warranty conditions.
Ensure that the AERL installation manual is followed and that all environmental, installation, and battery specifications are adhered to.
1. Managed Communication (Comms)
The AERL supports select brands of inverters and chargers (PCEs) using a Managed configuration via a CAN bus cable connection. This setup allows the AERL battery to relay crucial information to the connected PCEs, enabling them to adjust the battery's charge and discharge based on its internal cell temperature and state of charge. Managed Communications help optimize the battery's cell lifespan and ensure accurate State of Charge reporting.
The PCEs referenced in this section of the Integration Guide are compatible with CAN bus communications. Be sure to follow the PCEs' instructions for connecting Managed batteries.
1.1. AERL — recommended minimum battery modules
| Charger | Battery Modules |
|---|---|
| SRX 600/70-48 | 1 |
| SRX-R 600/60-48 | 1 |
1.2. Victron Energy — recommended minimum battery modules
| Inverter | Single Phase | Three Phase |
|---|---|---|
| Multiplus 48/500/6 | 1 | 1 |
| Multiplus 48/800/9 | 1 | 1 |
| Multiplus 48/1200/13 | 1 | 2 |
| Multiplus 48/1600/20 | 1 | 2 |
| Multiplus 48/2000/25 | 1 | 3 |
| Multiplus 48/2000/25-50 120V | 1 | 3 |
| Multiplus 48/3000/35 | 1 | 4 |
| Multiplus 48/5000/70 | 2 | 6 |
| Multiplus II (GX) 48/3000/35-32 | 1 | 4 |
| Multiplus II (GX) 48/5000/70-50 | 2 | 6 |
| Multiplus II 120V 48/3000/35-50 | 1 | 4 |
| Multiplus II 120V 48/5000/70-95 | 2 | 6 |
| Multiplus II 48/8000/110-100 | 3 | 10 |
| Multiplus II 48/10000/140-100 | 4 | 12 |
| Multiplus II 48/15000/200-100 | 6 | 18 |
| Quattro 48/3000/35-50/50 120V | 1 | 4 |
| Quattro 48/5000/70-100/100 120V | 2 | 6 |
| Quattro 48/10000/140-100/100 120V | 3 | 12 |
| Quattro 48/5000/70-100/100 | 2 | 6 |
| Quattro 48/8000/110-100/100 | 2 | 10 |
| Quattro 48/10000/140-100/100 | 4 | 12 |
| Quattro 48/15000/200-100/100 | 6 | 18 |
| Quattro 48/15000/200-100/100 277V | 6 | 18 |
| Quattro II 48/5000/70-50 | 2 | 6 |
| RS Smart solar 48/6000 | 2 | 6 |
| Multi RS Solar 48/6000 | 2 | 6 |
| Multi RS Solar 48/6000 Dual Tracker | 2 | 6 |
1.3. Deye Inverter Technology — recommended minimum battery modules
| Inverter | Battery Modules |
|---|---|
| SUN-3.6K-SG01LP1-EU | 2 |
| SUN-5K-SG01LP1-EU | 2 |
| SUN-7.6K-SG01LP1-EU | 3 |
| SUN-8K-SG01LP1-EU | 3 |
| SUN-12K-SG01LP1-EU | 4 |
| SUN-14K-SG01LP1-EU | 4 |
| SUN-16K-SG01LP1-EU | 5 |
| SUN-3.6K-SG03LP1-EU | 2 |
| SUN-4.6k-SG03LP1-EU | 2 |
| SUN-5K-SG03LP1-EU | 2 |
| SUN-5.5K-SG03LP1-EU | 2 |
| SUN-6K-SG03LP1-EU | 2 |
| SUN-5K-SG04LP3-EU | 2 |
| SUN-6K-SG04LP3-EU | 2 |
| SUN-8K-SG04LP3-EU | 3 |
| SUN-10K-SG04LP3-EU | 3 |
| SUN-12-SG04LP3-EU | 4 |
| SUN-3K-SG04LP1-EU | 1 |
| SUN-3.6-SG04LP1-EU | 2 |
| SUN-5K-SG04LP1-EU | 2 |
| SUN-6K-SG04LP1-EU | 2 |
| SUN-3.6K-SG05LP1-EU | 2 |
| SUN-5K-SG05LP1-EU | 2 |
| SUN-6K-SG05LP1-EU | 2 |
| SUN-7K-SG05LP1-EU | 2 |
| SUN-7.6-SG05LP1-EU | 3 |
| SUN-8K-SG05LP1-EU | 3 |
| SUN-5K-SG01LP1-US | 2 |
| SUN-6K-SG01LP1-US | 2 |
| SUN-7.6K-SG01LP1-US | 3 |
| SUN-8K-SG01LP1-US | 3 |
| SUN-12K-SG04LP1-US | 4 |
1.4. Noark — recommended minimum battery modules
| Inverter | Battery Modules |
|---|---|
| Ex9N-DH-3KS-AU | 1 |
| Ex9N-DH-3.6KS-AU | 1 |
| Ex9N-DH-5KS-AU | 2 |
| Ex9N-DH-6KS-AU | 2 |
| Ex9N-DH-7.6KS-AU | 3 |
| Ex9N-DH-8KS-AU | 3 |
| Ex9N-DH-5KT-AU | 2 |
| Ex9N-DH-6KT-AU | 2 |
| Ex9N-DH-8KT-AU | 3 |
| Ex9N-DH-10KT-AU | 3 |
| Ex9N-DH-12KT-AU | 4 |
| Ex9N-DH-3KS-AU | 1 |
2. Self-Managed Communication (No Comms)
The AERL LiFe² allows connection of PCEs that require manual programming of charge settings to control charge and discharge from the battery, known as Self-Managed (No Comms). The PCE must have the ability to customize its charge settings to suit the battery's requirements.
This section outlines the settings and the minimum battery requirements for popular brands of PCEs. If your selected PCE is not listed here, please get in touch with AERL for further confirmation of settings.
2.1. LiFe² 5120S basic charge and discharge settings
| Parameter | Battery Specification |
|---|---|
| Charge Voltage DC | 56V |
| Max Charge Current | 70A |
| Max Discharge Current | 100A |
| Max Depth of Discharge | 90% |
3. Selectronic instructions
3.1. Selectronic SP PRO — recommended minimum battery modules
| Inverter | Single Phase | Three Phase |
|---|---|---|
| SPMC480 | 2 | 6 |
| SPMC481 | 2 | 6 |
| SPMC482 | 3 | 9 |
3.2. Selectronic SP PRO settings (Self-Managed)
| Setting | Tab | Input Data |
|---|---|---|
| Battery Type | Quick Start | LiFePO4 |
| Battery Capacity | Quick Start | Total Ah Capacity of LiFe² 5120S installed |
| Voltage DC Shutdown 0% Load | Inverter | 49.50V (10% SoC) |
| Voltage DC Shutdown 100% Load | Inverter | 46V |
| Recovery Voltage | Inverter | 52V |
| Shut Down SoC % | Inverter | 20% (minimum) |
| Max Charge Voltage | Battery | 56V |
| High Battery Alert voltage | Battery | 58.3V |
| High Battery Alert Clear | Battery | 57.3V |
| Periodic Equalise | Battery | N/A |
| Periodic Recharge | Battery | 14 Days |
| Peukert's Exponent | Battery | 1.02 |
| Limit Charge Above °C | Battery | 50°C |
| Limit Rate % | Battery | 0 |
| Max Charge Current % or Amp | Charger | 0.7C – 70% of total Ah Capacity Installed |
| Initial Return voltage | Charger | 52.8V |
| Initial Return SoC | Charger | 95% |
| Initial Stage Voltage | Charger | 54V |
| Initial Stage Current | Charger | 100% |
| Initial Stage Time | Charger | 40 min |
| Bulk Stage Voltage | Charger | 55V |
| Bulk Stage Current | Charger | 20% |
| Bulk stage Time | Charger | 30 min |
| Absorb Stage Voltage | Charger | 55V |
| Absorb Stage Current | Charger | 10% |
| Absorb – Float Transition Net Change | Charger | 1% |
| Absorb – Float Transition Change Time | Charger | 5 min |
| Absorb – Float Max Time | Charger | 10 min |
| Float Stage Voltage | Charger | 55V |
| Long Term Float Voltage | Charger | 55V |
| Equalise Stage Voltage | Charger | 55V |
| Equalise Current | Charger | 10% |
| Equalise Time | Charger | 1hr |
| Min Temp Compensation °C | Charger | N/A |
| Max Temp Compensation °C | Charger | N/A |
| Ref A Temp Compensation mV/cell/°C | Charger | N/A |
| Ref B Temp Compensation mV/cell/°C | Charger | N/A |
4. Solis instructions
4.1. Solis — recommended minimum battery modules
| Inverter | Single Phase | Three Phase |
|---|---|---|
| RHI-3K-48ES-5G | 1 | — |
| RHI-3.6-48ES-5G | 1 | — |
| RHI-4.6K-48ES-5G | 2 | — |
| RHI-5K-48ES-5G | 2 | — |
| RHI-6K-48ES-5G | 2 | — |
| RAI-3K-48ES-5G | 1 | — |
| S5-EH1P3K-L | 1 | — |
| S5-EH1P3.6K-L | 1 | — |
| S5-EH1P4.6K-L | 2 | — |
| S5-EH1P5K-L | 2 | — |
| S5-EH1P6K-L | 2 | — |
| S5-EO1P4K-48 | 2 | — |
| S5-EO1P4K-48-P | 2 | — |
| S5-EO1P5K-48 | 2 | — |
| S5-EO1P5K-48-P | 2 | — |
| S6-EO1P4K-48 | 2 | 4 |
| S6-EO1P4K-48 | 2 | 5 |
| S6-EH1P3K-L-EU | 1 | 3 |
| S6-EH1P3.6K-L-EU | 2 | 4 |
| S6-EH1P4.6K-L-EU | 2 | 4 |
| S6-EH1P5K-L-EU | 2 | 5 |
| S6-EH1P6K-L-EU | 2 | 6 |
| S6-EH1P3K-L-PRO | 1 | 3 |
| S6-EH1P3.6K-L-PRO | 2 | 4 |
| S6-EH1P5K-L-PRO | 2 | 5 |
| S6-EH1P6K-L-PRO | 2 | 6 |
| S6-EH1P8K-L-PRO | 3 | 7 |
4.2. Solis settings (Self-Managed)
| Setting | Input Data |
|---|---|
| Battery Type | Lead Acid Battery |
| Battery Capacity | Total Ah Capacity of LiFe² 5120S Installed |
| Floating Voltage | 56V |
| I_Max Discharge | Max. 100A per battery installed |
| I_Max Charge | Max. 70A per battery installed |
| Equalize Voltage | 56V |
| Over Discharge Voltage | 50.2V |
| Force Charge Voltage | 48V |
| ForceChg PLmt | Max. 3500W per battery installed |
| Temp. Compensation | 0 |
| AMB. Temp.Lower | 5°C |
| AMB. Temp.Upper | 45°C |
| Power Limit On | From Grid |
| Environment Temp (Save and Send) | Warm |
5. SMA instructions
5.1. SMA Sunny Island — recommended minimum battery modules (4.4M, 6.0H, 8.0H, 4548 & 6048)
| Inverter | Single Phase | Three Phase |
|---|---|---|
| SI 4.4M | 2 | 6 |
| SI 6.0H | 2 | 6 |
| SI 8.0H | 3 | 9 |
| 4548-US | 2 | 6 |
| 6048-US | 2 | 6 |
5.2. SMA Sunny Island settings (Self-Managed)
It is highly recommended that you use an external shunt to measure the state of charge. Using a shunt with SMA inverters will improve SoC accuracy. Refer to SMA manuals for instructions.
| Setting | Input Data |
|---|---|
| Battery Type | Valve Regulated Lead Acid |
| Nominal Battery Voltage | 48V |
| Nominal Battery Capacity | Total Ah Capacity of LiFe² 5120S Installed |
| Device Configuration | Charge |
| Maximum Charging Current | 0.7C – 70% of Total Ah Capacity Installed |
| Time for Boost | 2 Hours |
| Time for Equalisation Charge | 2 Hours |
| Time for Full Charge | 2 Hours |
| Discharge Cut Off Voltage | 49.5V |
| Maximum discharge Current | Leave Default |
| Cell Charge Nominal for Boost Charge | 2.35V |
| Cell Charge Nominal for Full Charging | 2.35V |
| Cell Charge Nominal for Equalisation Charge | 2.35V |
| Float Voltage Cyclic Applications | 2.35V |
| Float Voltage UPS/Standby Applications | 2.33V |
| Cycle Time Full Charge | 7 Days |
| Cycle Time Equalisation Charge | 30 Days |
| Battery Temperature Compensation | 0°C |
| Automatic Equalisation Charge | Disable (OFF) |
| Voltage Setpoint with Deactivated BMS | 56V |
| Start Time A (Protection Mode) | Default |
| Start Time B (Protection Mode) | Default |
| End Time A (Protection Mode) | Default |
| End Time B (Protection Mode) | Default |
| Limit of Battery State of Charge A (Protection Mode) | 30% |
| Limit of Battery State of Charge B (Protection Mode) | 25% |
| Limit of Battery State of Charge C (Protection Mode) | 20% |
5.3. SMA Sunny Island settings continued (Self-Managed)
| Setting | Section | Input Data |
|---|---|---|
| Battery Type | Basic | Valve Regulated Lead Acid |
| Nominal Battery Voltage | Basic | 48V |
| Nominal Battery Capacity | Basic | Total Ah Capacity of LiFe² 5120S Installed |
| 222.01 BatChrgCurMax | Installer Mode | 0.7C – 70% of Total Ah Capacity Installed |
| 222.02 AptTmBoost | Expert Mode | 120min |
| 222.03 AptTMFul | Expert Mode | 2 Hours |
| 222.04 AptTmEqu | Expert Mode | 2 Hours |
| 222.05 CycTmFul | Expert Mode | 7 Days |
| 222.06 CycTmEqu | Expert Mode | 30 Days |
| 222.07 ChrgVtgBoost | Expert Mode | 2.35V |
| 222.08 ChrgVtgFul | Expert Mode | 2.35V |
| 222.09 ChrgVtgEqu | Expert Mode | 2.35V |
| 222.10 ChrgVtgEqu | Expert Mode | 2.35V Cyclic / 2.33 Standby |
| 222.11 BatTmpCps | Expert Mode | 0°C |
| 222.12 AutoEquChrgEna | Expert Mode | Disable (OFF) |
| 222.13 BatChrgVtgMan | Expert Mode | 56V |
| 223.01 BatPro1TmStr | 223# Protection | Default |
| 223.02 BatPro1TmStp | 223# Protection | Default |
| 223.03 BatPro2TmStr | 223# Protection | Default |
| 223.04 BatPro2TmStp | 223# Protection | Default |
| 223.05 BatPro1Soc | 223# Protection | 30% |
| 223.06 BatPro1Soc | 223# Protection | 25% |
| 223.07 BatPro1Soc | 223# Protection | 20% |
Integrating the LiFe² with a PCE not listed here? Contact AERL for confirmation of settings, or see the LiFe² battery product page for datasheets and manuals.